Apartments for sale in new buildings in an excellent and quiet location in Zadar!
These are 2 smaller residential buildings, each building consisting of 5 apartments. The buildings have a basement, ground floor, first and second floor with access to roof terraces.
- Heating and cooling of apartments will be via a multi split system of air conditioning units. Each room gets its own unit, while the bathrooms, living room and hallway have electric underfloor heating.
- Each apartment has 2 outdoor parking spaces (1 covered + 1 uncovered) in the basement.
- The roof above the second floor is divided into roof terraces, and each apartment (except the ground floor apartment) has a separate roof terrace. They are partly covered and equipped with water, drainage and electricity connections.
- Parquet in the rooms at the customer’s choice between the two options offered, ceramic tiles at the customer’s choice within the given budget.
- Tile and parquet selection options available in the initial stages of the project until the moment of the order.
- The building will be connected to the sewage system, the construction of the building is concrete, thermal facade 10 cm.
AVAILABLE APARTMENTS:
BUILDING B
Apartment S2 in building B is located on the first floor of the building and occupies half of the entire floor. The apartment consists of an entrance (hallway), living room, kitchen and dining room, 2 bedrooms and a bathroom. The apartment has a covered terrace on the first floor and a roof terrace with a sea view (covered 10.43 m2 and uncovered 23.45 m2). The apartment also has 2 parking spaces (1 covered and 1 uncovered).
The total net area of the apartment is 83.35 m2.
The price of apartment S2 in building B is €237,000
The buildings are located in the immediate vicinity of all facilities necessary for life: supermarket, post office, school, kindergarten, pharmacy. The distance to the city center is 1.8 km, and to the sea and the city beach 2 km. The move-in deadline is the end of December 2024 for building B and the beginning of March 2025 for building A.
For additional information, contact us!